Jan 1, 2024 - 8 MIN READ

Spitalla Solar Photovoltaic Park 100 MW

The project consists of the design of a photovoltaic park with an installed capacity of 100 MW, developed according to contemporary engineering and renewable energy standards. The intervention includes the design of the photovoltaic field, energy conversion and transformation systems, internal electrical network, energy storage areas, supporting infrastructure, and monitoring and control systems. The project aims to optimize energy production, operational safety, long-term plant sustainability, and compliance with the technical and environmental requirements for modern solar power plants.

LEAD Consulting

LEAD Consulting